Tracker · synced from docs/hda.md
Months to Mount Everest
4.0
was 4.5
Four summits on the path
Core hypervisor work is advanced. The residual distance is product surface, real R640 iron, and ISO/datastore — not “can it virtualize.”
- Ship EFI 85% Buildable; release kit + signing thin
- Real R640 boot 25% Scaffold done; iron BOOT-OK open
- Network vSphere-like UI 12% Demo SPA; no TCP/HTTP stack yet
- Deploy Linux ISO 8% bzImage/initrd only; ISO path unbuilt
Production bar (M6.8 soak + M6.9 external):
100% on Latitude —
RAYNU-V-M6-EXT-OK. Hypervisor core ~78%.
Bottom line
M0→M7.4 software gates are closed on Latitude. M7.5 is
scaffolded (runbook + evidence) and
open on iron. Next hard gate:
RAYNU-V-R640-BOOT-OK on a real PowerEdge R640.
Numbers load from site/hda.json, regenerated from
docs/hda.md by ./tools/sync-hda-site.sh on
every HDA update. Last commit:
8f091fd.